Atlas partnered with Faith Technologies again at the McCain Foods plant in Othello, Wa. Massive cabinets were lifted 35 feet in the air and supported to the building trusses. These panels came in 4 pieces measuring 54 feet total after installation.

Atlas fabricated all of the frames and structural steel to mount the cabinets in house.  The tolerances were very tight and numerous pre-existing items were in the way during the install (including sprinkler lines, pipe bridge, etc.). It took a precise layout and precision spotting/equipment operation to perform the task without damage or injury. The walk on ceiling will be placed 1 inch below the installed cabinets and the exact location and elevation was paramount.

Each cabinet with frame weighed 4300 pounds.

Check out some images of the project.